In Provo-Orem-Lehi, UT, May 2025 BLS metro medians sit at $27.47/hr for Plumbers (-6.9% vs. U.S. MSA median), $25.59/hr for Carpenters, and $22.43/hr for Laborers. Applying 1.9x-2.5x contractor overhead puts typical bathroom remodel labor at $2,044 to $4,986 before fixtures. Published by US Home Data Lab for Provo-Orem-Lehi, UT Bathroom Remodel Costs & Metro, every remodeling cost table, fixture spec, wage rate, and federal grant limit comes from official government sources while separating voluntary 2010 ADA design guidance from mandatory IRC, IPC, and NEC building codes.
- MSA Plumber Pay
- $27.47/hr (-6.9% vs U.S.)
- MSA Carpenter Pay
- $25.59/hr (-5.2% vs U.S.)
- MSA Laborer Pay
- $22.43/hr
- Burdened Labor Est.
- $2,044–$4,986

Which verified registry records apply to Provo-Orem-Lehi, UT Bathroom Remodel?
Official public agency data, statutory thresholds, and compliance benchmarks governing Provo-Orem-Lehi, UT Bathroom Remodel are tabulated below for homeowner bid verification.
Local plumber pay runs -6.9% relative to the $29.52/hr national metro median, while carpenters run -5.2% vs. $27.00/hr.
| Trade Occupation | Hourly Median | 25th-75th Pct | Annual Median | vs. U.S. Median |
|---|---|---|---|---|
| Plumbers & Pipefitters | $27.47/hr | $22.59–$33.52 | $57,130 | -6.9% |
| Carpenters | $25.59/hr | $21.92–$29.39 | $53,230 | -5.2% |
| Construction Laborers | $22.43/hr | $18.25–$25.27 | $46,640 | -0.4% |
How do Provo-Orem-Lehi, UT Bathroom Remodel numbers scale across scenarios?
Computed scenarios in the table below translate Provo-Orem-Lehi, UT Bathroom Remodel benchmarks into practical homeowner remodeling budgets, labor multipliers, and sizing checkpoints.
| Work Phase | Typical Trade Hours | Metro Labor Range (2.2x Burden) | Inspection & Code Note |
|---|---|---|---|
| Selective Demo & Pre-1978 RRP | 8–16 hrs | $341–$897 | EPA 40 CFR 745 containment if pre-1978 >6 sq ft |
| Rough Plumbing & 2-In Drain | 14–26 hrs | $731–$1,786 | IPC/IRC 2-in shower trap + ASSE 1016 scald valve |
| Framing, Backer & Blocking | 12–22 hrs | $583–$1,407 | IRC R702.4.2 cement board + 2x8 grab-bar blocking |
| Finish Trim & Exhaust Vent | 8–14 hrs | $389–$896 | IRC M1505 >=50 CFM @ 0.25 in. w.g. exterior duct |
How does Provo-Orem-Lehi, UT Bathroom Remodel adjust for your home inputs?
Adjust parameters below inside local browser JavaScript to test how Provo-Orem-Lehi, UT Bathroom Remodel scales to your specific project dimensions without saving personal data.
Which related records compare closely to Provo-Orem-Lehi, UT Bathroom Remodel?
Inspect neighboring or comparable entries tabulated below to cross-check technical specifications, local wage costs, and regulatory rules alongside Provo-Orem-Lehi, UT Bathroom Remodel.
| Metro Area | Plumber Median | Carpenter Median | Laborer Median |
|---|---|---|---|
| Logan, UT-ID | $29.03/hr | $23.86/hr | $22.19/hr |
| Ogden, UT | $31.18/hr | $23.21/hr | $22.31/hr |
| St. George, UT | $27.27/hr | $22.63/hr | $21.96/hr |
| Salt Lake City-Murray, UT | $31.15/hr | $28.78/hr | $22.82/hr |
How do metro trade wages compare with U.S. baselines?
May 2025 BLS metro median wages shape burdened contractor labor costs before hardware, municipal permits, and overhead across Provo-Orem-Lehi, UT.
Who should not rely solely on Provo-Orem-Lehi, UT base wage medians?
In Provo-Orem-Lehi, UT, burdened shop labor (1.9x–2.5x direct BLS wages) for bathroom remodel typically spans $2,044 to $4,986 before tile, fixture hardware, and municipal permits.
Limitations & Who Should Skip
- Direct BLS hourly wages in Provo-Orem-Lehi, UT exclude workers comp, commercial liability insurance, bonding, and contractor overhead (~1.9x–2.5x multiplier).
- Material fixtures, specialty tile, and structural subfloor repairs sit outside labor-only payroll estimates.
Best-Fit Homeowner Profiles
- Best for bid comparison: Homeowners benchmarking itemized bathroom remodel quotes against Provo-Orem-Lehi, UT BLS payroll.
- Senior grant planning: Veterans and rural 62+ owners pairing metro labor quotes with VA SAH/HISA or USDA 504 funding.
What key rules and numbers govern Provo-Orem-Lehi, UT Bathroom Remodel?
Answers below summarize primary U.S. agency datasets, statutory limits, and residential IRC, IPC, or NEC building rules affecting Provo-Orem-Lehi, UT Bathroom Remodel.
How can Provo-Orem-Lehi, UT homeowners spot inflated bathroom remodel bids?
Require itemized trade hours, hardware SKUs, and permit fees separately; compare implied hourly billing directly against Provo-Orem-Lehi, UT's $27.47/hr plumber and $25.59/hr carpenter BLS baselines.
Should foundation or wet-wall work in Provo-Orem-Lehi, UT include a PE or permit check?
Yes. Moving shower drains or altering structural joists requires municipal permits, while foundation cracks >1/8 in warrant an independent $400-$800 licensed PE review before piering.
What do plumbers and carpenters earn in Provo-Orem-Lehi, UT for bathroom remodel?
May 2025 BLS metro tables report $27.47/hr median base pay for plumbers and $25.59/hr for carpenters in Provo-Orem-Lehi, UT before workers compensation, surety bonds, and shop overhead.
Why do Provo-Orem-Lehi, UT bathroom remodel labor quotes run $2,044 to $4,986?
Licensed contractors typically apply a 1.9x to 2.5x burden multiplier over raw BLS hourly payroll ($27.47/hr plumbers; $22.43/hr laborers) to cover insurance, licensing, vehicles, and supervision.
Does Original Medicare pay for bathroom remodel in Provo-Orem-Lehi, UT?
No, Original Medicare Parts A & B pay $0 for walk-in tubs and residential bath remodels. Eligible Utah residents check VA SAH ($133,042 FY27), VA HISA ($6,800/$2,000), or USDA Section 504 ($10,000 rural grant).
When do pre-1978 lead rules add cost in Provo-Orem-Lehi, UT?
Under 40 CFR 745, any paid contractor disturbing over 6 sq ft of interior painted surface in a pre-1978 Provo-Orem-Lehi, UT home must follow EPA Lead-Safe RRP containment rules.
What official benchmarks establish Provo-Orem-Lehi, UT Bathroom Remodel Costs & Metro thresholds here?
GradeMark anchors Provo-Orem-Lehi, UT Bathroom Remodel Costs & Metro on primary agency metrics including MSA Plumber Pay ($27.47/hr - -6.9% vs U.S.) and MSA Carpenter Pay ($25.59/hr - -5.2% vs U.S.). In Provo-Orem-Lehi, UT, May 2025 BLS metro medians sit at $27.47/hr for Plumbers (-6.9% vs. U.S. MSA median), $25.59/hr for. All inputs come from verifiable US government records or OEM spec sheets.
How does MSA Plumber Pay interact with local IRC, IPC, and NEC residential codes?
For Provo-Orem-Lehi, UT Bathroom Remodel Costs & Metro, federal statutory metrics like MSA Plumber Pay ($27.47/hr - -6.9% vs U.S.) and MSA Laborer Pay ($22.43/hr) operate alongside city-adopted residential IRC, IPC plumbing, and NEC 210.8 / 680.71 electrical inspection schedules rather than commercial 2010 ADA rules.
Which contractor bid checks apply when budgeting Provo-Orem-Lehi, UT Bathroom Remodel Costs & Metro?
Separate MSA Plumber Pay ($27.47/hr - -6.9% vs U.S.) and MSA Carpenter Pay ($25.59/hr - -5.2% vs U.S.) cleanly inside itemized estimates for Provo-Orem-Lehi, UT Bathroom Remodel Costs & Metro, checking 2021-2026 BLS material Producer Price Index shifts (+33% to +47%) and May 2025 BLS hourly wage baselines.
Who should pause or request an independent PE or permit audit on Provo-Orem-Lehi, UT Bathroom Remodel Costs & Metro?
Pause before paying >30% upfront deposits on Provo-Orem-Lehi, UT Bathroom Remodel Costs & Metro when contractors refuse written SKU sheets, claim Original Medicare pays ($0 under federal Medicare rules), or omit pre-1978 EPA Lead RRP containment (>6 sq ft).
Sources
- Occupational Employment and Wage Statistics (OEWS) Metropolitan Area Estimates (May 2025) — U.S. Bureau of Labor Statistics, May 2025 MSA Release (retrieved 2026-11-25)
- Occupational Employment and Wage Statistics (OEWS) State Estimates — SOC 47-1011, 47-2031, 47-2044, 47-2051, 47-2152 — U.S. Bureau of Labor Statistics, May 2025 OEWS State Release (retrieved 2026-11-23)
- VA Disability Housing Grants (SAH, SHA, HISA) FY 2027 Statutory Limits — U.S. Department of Veterans Affairs, FY 2027 (retrieved 2026-11-23)
- Direct Single Family Housing Loans and Grants Programs (87 FR 6772 — Section 504) — USDA Rural Housing Service / Federal Register, 87 FR 6772 (retrieved 2026-11-23)
- 40 CFR Part 745 Subpart E — Lead-Based Paint Renovation, Repair, and Painting (RRP) — U.S. EPA / eCFR, 2026-01-01 (retrieved 2026-11-23)
- USDA NRCS Soil Data Access (SSURGO) Linear Extensibility Percent (lep_r) — USDA Natural Resources Conservation Service, 2026 Live SDA (retrieved 2026-11-23)