Skip to main content
Grant Estimator

Pueblo, CO Foundation Repair, Piering & Slab Leveling Costs (May 2025 BLS Metro Data)

CBSA 39380 · Primary State: Colorado · May 2025 BLS Metro Trade Wages
Pueblo, CO Metro Cost Summary

Comparing Pueblo, CO labor bids to official May 2025 BLS tables reveals $31.11/hr plumber and $21.89/hr laborer medians, translating to $1,786 to $4,564 in burdened foundation repair & leveling labor before fixtures. Published by US Home Data Lab for Pueblo, CO Foundation Repair, Piering & Slab Leveling, every remodeling cost table, fixture spec, wage rate, and federal grant limit comes from official government sources while separating voluntary 2010 ADA design guidance from mandatory IRC, IPC, and NEC building codes.

MSA Plumber Pay
$31.11/hr (+5.4% vs U.S.)
MSA Carpenter Pay
$27.00/hr (+0.0% vs U.S.)
MSA Laborer Pay
$21.89/hr
Burdened Labor Est.
$1,786–$4,564
Concrete stem wall foundation and gravel perimeter drainage beside brick residential exterior
Perimeter clay grading and residential slab drainage around poured residential foundation walls.

What agency data backs Pueblo, CO Foundation Repair & Leveling benchmarks?

Compare documented specifications, statutory caps, and safety notices recorded for Pueblo, CO Foundation Repair & Leveling across public U.S. government filings.

Local plumber pay runs +5.4% relative to the $29.52/hr national metro median, while carpenters run +0.0% vs. $27.00/hr.

May 2025 BLS metro construction wages in Pueblo, CO (CBSA 39380)
Trade Occupation Hourly Median 25th-75th Pct Annual Median vs. U.S. Median
Plumbers & Pipefitters $31.11/hr $22.74–$45.19 $64,700 +5.4%
Carpenters $27.00/hr $22.69–$30.98 $56,150 At U.S. median
Construction Laborers $21.89/hr $19.58–$27.69 $45,530 -2.8%

How do residential factors shift Pueblo, CO Foundation Repair & Leveling estimates?

Compare computed residential ranges below to spot inflated contractor overhead markups or undersized system quotes prepared for Pueblo, CO Foundation Repair & Leveling.

Localized Foundation Repair & Leveling scope cost & trade hour matrix for Pueblo, CO
Work PhaseTypical Trade HoursMetro Labor Range (2.2x Burden)Inspection & Code Note
Perimeter Trenching & Excavation 12–24 hrs $499–$1,313 Hand-dig pier pockets clear of utility lines
Concrete Footing & Crack Prep 10–18 hrs $522–$1,238 Seal vertical shrinkage cracks; verify 6-in/10-ft grade
Sill Framing & Door Re-Hang 8–16 hrs $410–$1,080 Re-level sticking frames after PE elevation survey
Sub-Slab Plumbing Pressure Test 6–12 hrs $355–$933 Hydrostatic line test after slab lifting/piering

Will Pueblo, CO Foundation Repair & Leveling pass your home requirements?

Test custom residential project inputs below to confirm bathroom sizing, structural reserve capacity, or budget fit for Pueblo, CO Foundation Repair & Leveling.

What alternatives or neighbors surround Pueblo, CO Foundation Repair & Leveling?

Compare closely matched public records below to verify local market patterns, nearby county demographics, and available homeowner alternatives.

Nearby metro cost pages for Foundation Repair & Leveling
Metro AreaPlumber MedianCarpenter MedianLaborer Median
Boulder, CO $31.20/hr $28.73/hr $23.07/hr
Colorado Springs, CO $29.09/hr $27.61/hr $22.28/hr
Denver-Aurora-Centennial, CO $30.72/hr $31.21/hr $23.44/hr
Fort Collins-Loveland, CO $29.14/hr $28.04/hr $22.86/hr

How do metro trade wages compare with U.S. baselines?

May 2025 BLS metro median wages shape burdened contractor labor costs before hardware, municipal permits, and overhead across Pueblo, CO.

Metro BLS May 2025 Direct Trade Hourly Wages vs. U.S. MediansHorizontal bar comparison for Metro BLS May 2025 Direct Trade Hourly Wages vs. U.S. Medians (6 items): MSA Plumbers: $30.72; US Plumbers: $30.72; MSA Carpenters: $27.80; US Carpenters: $27.80; MSA Laborers: $22.02; US Laborers: $22.02.Metro BLS May 2025 Direct Trade Hourly Wages vs. U.S. MediansMSA Plumbers: $30.72MSA Plumbers$30.72US Plumbers: $30.72US Plumbers$30.72MSA Carpenters: $27.80MSA Carpenters$27.80US Carpenters: $27.80US Carpenters$27.80MSA Laborers: $22.02MSA Laborers$22.02US Laborers: $22.02US Laborers$22.02

Why must perimeter gutter grading precede foundation pier bids?

Extending downspouts 6 to 10 feet away from footings stabilizes seasonal moisture inside USDA active clay zones (6.0%+ clay expansion risk) before a $10,500 to $28,000 pier underpinning quote is evaluated.

Expansive Clay Soil Drainage and Foundation Pier Profile Cross-section showing exterior downspout extension 6 to 10 feet away from footing, high clay soil expansion zone (6% or higher), and helical or steel push piers bearing on deep stable soil. Slab & Footing Extend Downspout 6-10 ft High Clay Soil Expansion Zone (6.0%+ Moisture Heave / Shrink) Fix gutters & slope (6 in drop / 10 ft) before quoting piers Stable Load-Bearing Soil (Helical / Push Pier Depth) Helical / Push Pier
Surface drainage and deep support principles in high-risk clay soil (6.0% or higher expansion rating).

Who should not rely solely on Pueblo, CO base wage medians?

Because Colorado carries 9.19% high-swell clay risk, confirm downspout extensions (6-10 ft) and an independent $400-$800 PE survey before signing $10,500+ foundation pier quotes.

Limitations & Who Should Skip

  • Direct BLS hourly wages in Pueblo, CO exclude workers comp, commercial liability insurance, bonding, and contractor overhead (~1.9x–2.5x multiplier).
  • Material fixtures, specialty tile, and structural subfloor repairs sit outside labor-only payroll estimates.

Best-Fit Homeowner Profiles

  • Best for bid comparison: Homeowners benchmarking itemized foundation repair & leveling quotes against Pueblo, CO BLS payroll.
  • Senior grant planning: Veterans and rural 62+ owners pairing metro labor quotes with VA SAH/HISA or USDA 504 funding.

Which code checks and cost facts matter for Pueblo, CO Foundation Repair & Leveling?

Inspect plain-English explanations below covering regulatory caps, safety precautions, rough-in clearances, and budget checks tied directly to Pueblo, CO Foundation Repair & Leveling.

Does Original Medicare pay for foundation repair & leveling in Pueblo, CO?

No, Original Medicare Parts A & B pay $0 for walk-in tubs and residential bath remodels. Eligible Colorado residents check VA SAH ($133,042 FY27), VA HISA ($6,800/$2,000), or USDA Section 504 ($10,000 rural grant).

When do pre-1978 lead rules add cost in Pueblo, CO?

Under 40 CFR 745, any paid contractor disturbing over 6 sq ft of interior painted surface in a pre-1978 Pueblo, CO home must follow EPA Lead-Safe RRP containment rules.

How can Pueblo, CO homeowners spot inflated foundation repair & leveling bids?

Require itemized trade hours, hardware SKUs, and permit fees separately; compare implied hourly billing directly against Pueblo, CO's $31.11/hr plumber and $27.00/hr carpenter BLS baselines.

Should foundation or wet-wall work in Pueblo, CO include a PE or permit check?

Yes. Moving shower drains or altering structural joists requires municipal permits, while foundation cracks >1/8 in warrant an independent $400-$800 licensed PE review before piering.

What do plumbers and carpenters earn in Pueblo, CO for foundation repair & leveling?

May 2025 BLS metro tables report $31.11/hr median base pay for plumbers and $27.00/hr for carpenters in Pueblo, CO before workers compensation, surety bonds, and shop overhead.

Why do Pueblo, CO foundation repair & leveling labor quotes run $1,786 to $4,564?

Licensed contractors typically apply a 1.9x to 2.5x burden multiplier over raw BLS hourly payroll ($31.11/hr plumbers; $21.89/hr laborers) to cover insurance, licensing, vehicles, and supervision.

What official benchmarks establish Pueblo, CO Foundation Repair, Piering & Slab Leveling thresholds here?

GradeMark anchors Pueblo, CO Foundation Repair, Piering & Slab Leveling on primary agency metrics including MSA Plumber Pay ($31.11/hr - +5.4% vs U.S.) and MSA Carpenter Pay ($27.00/hr - +0.0% vs U.S.). Comparing Pueblo, CO labor bids to official May 2025 BLS tables reveals $31.11/hr plumber and $21.89/hr laborer medians, translating. All inputs come from verifiable US government records or OEM spec sheets.

How does MSA Plumber Pay interact with local IRC, IPC, and NEC residential codes?

For Pueblo, CO Foundation Repair, Piering & Slab Leveling, federal statutory metrics like MSA Plumber Pay ($31.11/hr - +5.4% vs U.S.) and MSA Laborer Pay ($21.89/hr) operate alongside city-adopted residential IRC, IPC plumbing, and NEC 210.8 / 680.71 electrical inspection schedules rather than commercial 2010 ADA rules.

Which contractor bid checks apply when budgeting Pueblo, CO Foundation Repair, Piering & Slab Leveling?

Separate MSA Plumber Pay ($31.11/hr - +5.4% vs U.S.) and MSA Carpenter Pay ($27.00/hr - +0.0% vs U.S.) cleanly inside itemized estimates for Pueblo, CO Foundation Repair, Piering & Slab Leveling, checking 2021-2026 BLS material Producer Price Index shifts (+33% to +47%) and May 2025 BLS hourly wage baselines.

Who should pause or request an independent PE or permit audit on Pueblo, CO Foundation Repair, Piering & Slab Leveling?

Pause before paying >30% upfront deposits on Pueblo, CO Foundation Repair, Piering & Slab Leveling when contractors refuse written SKU sheets, claim Original Medicare pays ($0 under federal Medicare rules), or omit pre-1978 EPA Lead RRP containment (>6 sq ft).

Sources

  1. Occupational Employment and Wage Statistics (OEWS) Metropolitan Area Estimates (May 2025) — U.S. Bureau of Labor Statistics, May 2025 MSA Release (retrieved 2026-11-25)
  2. Occupational Employment and Wage Statistics (OEWS) State Estimates — SOC 47-1011, 47-2031, 47-2044, 47-2051, 47-2152 — U.S. Bureau of Labor Statistics, May 2025 OEWS State Release (retrieved 2026-11-23)
  3. VA Disability Housing Grants (SAH, SHA, HISA) FY 2027 Statutory Limits — U.S. Department of Veterans Affairs, FY 2027 (retrieved 2026-11-23)
  4. Direct Single Family Housing Loans and Grants Programs (87 FR 6772 — Section 504) — USDA Rural Housing Service / Federal Register, 87 FR 6772 (retrieved 2026-11-23)
  5. 40 CFR Part 745 Subpart E — Lead-Based Paint Renovation, Repair, and Painting (RRP) — U.S. EPA / eCFR, 2026-01-01 (retrieved 2026-11-23)
  6. USDA NRCS Soil Data Access (SSURGO) Linear Extensibility Percent (lep_r) — USDA Natural Resources Conservation Service, 2026 Live SDA (retrieved 2026-11-23)

Comparable Bath & Kitchen Cost Directories