Skip to main content
Grant Estimator

District of Columbia (DC) Bath Remodeling, Trade Wages & Foundation Risk Reference

Census 2024 Pop. 702,250 · South / South Atlantic · Verified 2025-2026 Agency Benchmarks
District of Columbia (DC) Wage & Ground Risk Summary

In District of Columbia (DC), May 2025 BLS median trade wages stand at $29.65/hr for Cement Masons (#13 of 51 highest-paying) and $48.57/hr for Plumbers (#1 of 51 highest-paying). USDA NRCS soil surveys classify 0.0% of District of Columbia horizons as high shrink-swell clay (6.0%+ clay expansion risk), USGS assigns Seismic Design Category A at Washington, and FEMA records 8 major federal disaster declarations since 2010.

Jurisdictions
51 (50 States + DC)
Primary Agencies
EPA, BLS, USDA, USGS, VA
Fixtures Indexed
48,953 Certified SKUs
Medicare Tub Rule
$0 Covered (Federal Medicare rule)
Concrete stem wall foundation and gravel perimeter drainage beside brick residential exterior
Perimeter clay grading and residential slab drainage around poured residential foundation walls.

Which cost and soil realities affect District of Columbia homeowners?

District of Columbia ranks #1 of 51 jurisdictions for plumber base pay ($48.57/hr, higher than 98.0% of jurisdictions, $17.85/hr higher than the $30.72/hr median) and #13 of 51 jurisdictions for cement masons ($29.65/hr, $1.66/hr higher than the $27.99/hr median).

Ground conditions place District of Columbia in a low expansive-clay baseline (#1 of 51 jurisdictions for low clay risk at 0.0% high-swell horizons; lower than 98.0% of jurisdictions; 4.84 pts lower than the 4.84% median). At Washington, USGS earthquake maps list Seismic Design Category A (SDS 0.13g), keeping residential sill bracing within standard gravity framing rules. No statewide WaterSense partner rebates appear in the active EPA dataset for District of Columbia; check county municipal water authorities locally.

How do District of Columbia trade wages and soil benchmarks compare with national medians?

Direct May 2025 BLS median hourly wages for District of Columbia trade classifications sit alongside US 51-jurisdiction benchmarks below (0.00% USDA high-swell clay share vs 4.84% national median).

District of Columbia May 2025 BLS wage data Wages vs. US MediansHorizontal bar comparison for District of Columbia May 2025 BLS wage data Wages vs. US Medians (6 items): DC Plumbers: $48.57; US Plumbers: $30.72; DC Masons: $29.65; US Masons: $27.99; DC Carpenters: $29.67; US Carpenters: $27.80.District of Columbia May 2025 BLS wage data Wages vs. US MediansDC Plumbers: $48.57DC Plumbers$48.57US Plumbers: $30.72US Plumbers$30.72DC Masons: $29.65DC Masons$29.65US Masons: $27.99US Masons$27.99DC Carpenters: $29.67DC Carpenters$29.67US Carpenters: $27.80US Carpenters$27.80
District of Columbia Plumber Pay National Rank (#1 = Highest Base Wage)District of Columbia Plumber Pay National Rank (#1 = Highest Base Wage): ranked 1 out of 51 (Top 2% (100th pct)). Higher value ranks closer to #1.District of Columbia Plumber Pay National Rank (#1 = Highest Base Wage)#1 of 51 · Top 2% (100th pct)#51 (Lowest)Median#1 (Highest)

Why must perimeter gutter grading precede foundation pier bids?

Extending downspouts 6 to 10 feet away from footings stabilizes seasonal moisture inside USDA active clay zones (6.0%+ clay expansion risk) before a $10,500 to $28,000 pier underpinning quote is evaluated.

Expansive Clay Soil Drainage and Foundation Pier Profile Cross-section showing exterior downspout extension 6 to 10 feet away from footing, high clay soil expansion zone (6% or higher), and helical or steel push piers bearing on deep stable soil. Slab & Footing Extend Downspout 6-10 ft High Clay Soil Expansion Zone (6.0%+ Moisture Heave / Shrink) Fix gutters & slope (6 in drop / 10 ft) before quoting piers Stable Load-Bearing Soil (Helical / Push Pier Depth) Helical / Push Pier
Surface drainage and deep support principles in high-risk clay soil (6.0% or higher expansion rating).

How do District of Columbia hourly trade rates and FEMA counts score nationwide?

Comparing District of Columbia directly to U.S. federal medians below helps homeowners distinguish local skilled labor costs from statewide geotechnical hazards.

District of Columbia vs. U.S. national medians
Cement Mason Median Wage $29.65/hr $27.99/hr +5.9% (+$1.66/hr) #13 of 51 (highest = #1)
Plumber Median Wage $48.57/hr $30.72/hr +58.1% (+$17.85/hr) #1 of 51 (highest = #1)
High Clay Expansion Risk (6%+) 0.0% 4.84% -4.84 pts #1 of 51 (lowest clay = #1)
FEMA Major Disasters (2010+) 8 19.0 -11 disasters #2 of 51 (fewest = #1)

How do District of Columbia hourly and annual construction salaries line up?

Compare proposed hourly shop rates on District of Columbia remodeling bids directly with published May 2025 BLS trade worker pay.

May 2025 BLS state median wages for construction trades in District of Columbia
47-2051 Cement Masons and Concrete Finishers $29.65/hr $61,680
47-2044 Tile and Stone Setters Not published Not published
47-2031 Carpenters $29.67/hr $61,710
47-2152 Plumbers, Pipefitters, and Steamfitters $48.57/hr $101,020
47-1011 First-Line Supervisors of Construction Trades $41.60/hr $86,520

What expansive clay, earthquake, and FEMA records affect slabs in District of Columbia?

USDA soil surveys record 1,208 soil samples across District of Columbia, flagging 0% with high clay soil expansion risk (6.0% or higher). USGS sets Seismic Design Category A at Washington, alongside 8 FEMA county disaster declarations since 2010.

How does homeowner housing demand cluster across District of Columbia counties?

Major District of Columbia counties below anchor regional permitting volumes; open any county link to review full hazard and senior grant eligibility.

Largest Census 2024 counties and equivalents in District of Columbia
District of Columbia 11001 702,250 100.0%

Which neighboring state benchmarks frame regional District of Columbia quotes?

Cross-border benchmarks near District of Columbia highlight regional swings in skilled plumbing labor rates and clay-soil foundation exposure.

Neighboring state wage, clay soil, and earthquake benchmarks
Neighbor StateCement Mason AnnualPlumber AnnualHigh Clay %Earthquake Zone
Maryland (MD) $51,950 $65,400 1.26% A
Virginia (VA) $50,930 $60,470 4.85% A

How does a contractor labor bid compare to District of Columbia's BLS median?

Enter estimated crew hours and your quoted labor rate to compare direct BLS pay against an illustrative 2.15x contractor shop rate covering workers compensation and overhead.

What key rules and numbers govern District of Columbia (DC) Bath Remodeling, Trade?

Questions below summarize primary US agency datasets, statutory limits, and IRC, IPC, or NEC compliance rules affecting District of Columbia (DC) Bath Remodeling, Trade.

Does USGS Seismic Category A in District of Columbia affect bathroom remodeling?

USGS maps place District of Columbia's reference station in Seismic Design Category A, keeping bath framing and 2x8 grab-bar blocking under standard residential gravity rules alongside local plumbing and GFCI permits.

Will DC property insurance pay for clay-related slab movement?

Despite 8 FEMA disaster declarations in District of Columbia since 2010, standard HO-3 insurance excludes soil settling and expansive clay shifting unless triggered by a sudden accidental pipe rupture.

Which District of Columbia bath upgrades qualify for local water utility rebates?

Across 0 cataloged District of Columbia utility rebate programs, certified WaterSense toilets, showerheads, and lavatory faucets qualify when purchased new with itemized contractor or retail invoices.

Will Medicare pay for a walk-in tub in District of Columbia or which grants apply?

Original Medicare Parts A and B pay $0 for walk-in tubs in District of Columbia. Qualifying owners check VA SAH ($133,042 FY27), VA SHA ($26,654), VA HISA ($6,800/$2,000), rural age-62+ USDA 504 ($10,000 grant), or Medicaid 1915(c) waivers.

When does a District of Columbia bathroom remodel require EPA Lead-Safe RRP certification?

Any paid contractor renovating a pre-1978 residence in District of Columbia must follow 40 CFR 745 Lead-Safe RRP containment rules whenever interior work disturbs more than 6 square feet of painted surface per room.

How do homeowners verify licensed remodeling contractors in District of Columbia?

District of Columbia features 0 indexed city contractor directories here. Always check active license numbers, surety bonds, and liability coverage directly on District of Columbia's official licensing portal before paying deposits.

How should District of Columbia homeowners benchmark plumber and concrete quotes?

Audit itemized District of Columbia bids against $48.57/hr plumber, $29.65/hr cement mason, and not separately tabulated tile-setter BLS medians before factoring contractor markup, permits, and workers compensation insurance.

Are District of Columbia homes exempt from expansive soil movement?

No state is completely immune: District of Columbia posts 0.0% high-swell horizons (1.36% average), so maintaining 6-inch-per-10-foot yard slope protects basement and bathroom tile slabs.

Sources

  1. Occupational Employment and Wage Statistics (OEWS) State Estimates — SOC 47-1011, 47-2031, 47-2044, 47-2051, 47-2152 — U.S. Bureau of Labor Statistics, May 2025 OEWS State Release (retrieved 2026-11-23)
  2. USDA NRCS Soil Data Access (SSURGO) Linear Extensibility Percent (lep_r) — USDA Natural Resources Conservation Service, 2026 Live SDA (retrieved 2026-11-23)
  3. USGS Earthquake Hazards Program — ASCE 7-22 Seismic Design Maps API — U.S. Geological Survey, ASCE 7-22 (retrieved 2026-11-23)
  4. OpenFEMA Disaster Declarations Summaries v2 — FEMA, OpenFEMA v2 (retrieved 2026-11-23)
  5. VA Disability Housing Grants (SAH, SHA, HISA) FY 2027 Statutory Limits — U.S. Department of Veterans Affairs, FY 2027 (retrieved 2026-11-23)
  6. 38 CFR Part 17 §§ 17.3100-17.3130 — Home Improvements and Structural Alterations (HISA) — eCFR / Office of the Federal Register, 2026-01-01 (retrieved 2026-11-23)
  7. Direct Single Family Housing Loans and Grants Programs (87 FR 6772 — Section 504) — USDA Rural Housing Service / Federal Register, 87 FR 6772 (retrieved 2026-11-23)
  8. 7 CFR Part 3550 Subpart C — Section 504 Direct Rural Housing Loans & Grants — USDA Rural Housing Service / eCFR, 2026-01-01 (retrieved 2026-11-23)
  9. IRS Publication 502: Medical and Dental Expenses (Capital Expenses) — Internal Revenue Service, 2025/2026 (retrieved 2026-11-23)
  10. CMS National Coverage Determination 280.1 — Durable Medical Equipment Reference List — Centers for Medicare & Medicaid Services (CMS), CMS NCD 280.1 (retrieved 2026-11-23)
  11. 40 CFR Part 745 Subpart E — Lead-Based Paint Renovation, Repair, and Painting (RRP) — U.S. EPA / eCFR, 2026-01-01 (retrieved 2026-11-23)
  12. U.S. Census Bureau 2024 National Gazetteer & Population Estimates (core/shared) — U.S. Census Bureau, Vintage 2024 (retrieved 2026-11-23)

Active Remodeling Markets in District Of Columbia