Skip to main content
Grant Estimator

Active Licensed Remodeling & Construction Contractors in Donald, OR

Verified Registry: Oregon CCB, Washington State L&I · 12 Active Firms
Official Registry Verification

State licensing extracts for Donald, OR list 12 active contractors (12 verified firms shown below) spanning 1 ZIP code via Oregon CCB, Washington State L&I, ensuring transparent license checks before deposit payments. Published by US Home Data Lab for Active Licensed Remodeling & Construction Contractors, every remodeling cost table, fixture spec, wage rate, and federal grant limit comes from official government sources while separating voluntary 2010 ADA design guidance from mandatory IRC, IPC, and NEC building codes.

Total Active Firms
12
Listed Sample
12
ZIPs Covered
1
OR Plumber BLS
$46.66/hr
Installer hands checking level alignment of a stainless steel bathroom grab bar on ceramic tile
Licensed US residential tradespeople executing tiled bath rough-in and finish plumbing work.

What hourly labor floor anchors remodeling quotes in Donald, OR?

Use Oregon's May 2025 BLS medians ($46.66/hr (#3 of 51) plumbers; $32.95/hr (#5 of 51) cement masons) to audit labor markups across all 12 active Donald firms from Oregon CCB, Washington State L&I.

How can you search verified Donald contractors by license ID or ZIP?

Below are 12 verified active licenses out of 12 total firms in Donald; check workers compensation and trade endorsements on Oregon CCB, Washington State L&I prior to contract signing.

Active licensed contractors in Donald, Oregon - Oregon CCB, Washington State L&I
All Oregon Excavating LLC 180666 Commercial General Contractor Level 2 ACTIVE Active Feed Donald 97020
Bear Electric Inc BEAREI*160JJ GENERAL ACTIVE Active Feed Donald 97020
Bear Electric Inc 20919 Commercial General Contractor Level 2 ACTIVE Active Feed Donald 97020
Bradley Craig Snethen 202077 Residential Specialty Contractor ACTIVE Active Feed Donald 97020
E&A Empire Construction LLC EAEMPEC746NU GENERAL ACTIVE Active Feed Donald 97020
Elite Custom Construction LLC 226695 Residential Specialty Contractor ACTIVE Active Feed Donald 97020
Falcon Roofing Inc 227651 Commercial General Contractor Level 2 ACTIVE Active Feed Donald 97020
Matthews Concrete LLC 223810 Residential Specialty Contractor ACTIVE Active Feed Donald 97020
Paul Eric Shamburg 147952 Residential General Contractor ACTIVE Active Feed Donald 97020
Premier Propane Inc 236483 Residential Specialty Contractor ACTIVE Active Feed Donald 97020
Valley Pacific Construction Inc 15477 Commercial General Contractor Level 2 ACTIVE Active Feed Donald 97020
Willamette River Construction LLC 237380 Commercial General Contractor Level 2 ACTIVE Active Feed Donald 97020

Where does Donald contractor registry standing fall short of full vetting?

Active registration on Oregon CCB, Washington State L&I confirms legal standing in Donald, but specialty drain, GFCI wiring, and lead abatement still demand endorsement checks.

Limitations & Who Should Skip

  • Official licensing records confirm baseline active status with Oregon CCB, Washington State L&I, NOT individual craftsmanship, lien history, or open insurance claims.
  • General contractor licenses listed here do NOT automatically cover licensed Master Plumber drains, dedicated NEC 680.71 GFCI wiring, or EPA 40 CFR 745 Pre-1978 lead abatement unless separately endorsed.
  • Homeowners needing structural underpinning (>1/8 in slab shift) should NOT sign foundation pier bids without an independent $400-$800 PE report first.

Best-Fit Homeowner Profiles

  • Verify license live on signing day: Confirm the exact license number on Oregon CCB, Washington State L&I's live portal to catch mid-year bond cancellations.
  • Require itemized rough-in quotes: Split bath fixtures, 2-inch drain upgrades, GFCI subpanels, and permit fees cleanly instead of taking one lump-sum quote.

Which wet-zone code clearances protect bathroom occupants from injury?

Inspectors check IPC 412.3 ASSE 1016 anti-scald pressure balancing, dedicated NEC 210.8 / 680.71 GFCI protection, and EPA 40 CFR 745 lead containment above 6 sq ft in pre-1978 housing.

Bathroom Wet-Zone Code Safety: ASSE 1016, NEC 210.8 GFCI and EPA RRP Diagram summarizing three bathroom remodeling compliance zones: IPC 412.3 / ASSE 1016 anti-scald valve, NEC 210.8 / 680.71 dedicated GFCI circuit with service access, and EPA 40 CFR 745 6 sq ft lead-safe trigger in pre-1978 homes. 1. IPC 412.3 / ASSE 1016 Anti-Scald Mixing Valve Balances pressure & temp 1070 limiter on tub fillers 2. NEC 210.8 / 680.71 GFCI Dedicated 15A/20A Circuit Class A ground-fault trip Accessible pump panel 3. EPA 40 CFR 745 > 6 sq ft Pre-1978 Lead-Safe RRP Plastic containment zone EPA-certified firm required
Key residential plumbing, electrical, and lead-containment code checkpoints during bathroom remodeling.

What key rules and numbers govern Active Licensed Remodeling & Construction Contractors?

Questions below summarize primary US agency datasets, statutory limits, and IRC, IPC, or NEC compliance rules affecting Active Licensed Remodeling & Construction Contractors.

Which specialty remodels require extra credentials in Donald, OR?

Pre-1978 interior demolition (>6 sq ft), 2-inch shower drain relocation, dedicated GFCI circuits, and engineered foundation piering require specific trade licenses beyond general contractor registration.

What are the 2025 BLS remodeling trade wages in Oregon near Donald?

May 2025 BLS medians across Oregon show direct pay of $46.66/hr for plumbers and $32.95/hr for cement masons before payroll taxes, workers comp, bonds, and contractor management margins.

Can a contractor in Donald pay to rank higher on this page?

No. GradeMark never sells ranking placement inside any Donald, OR state registry table; commercial partner calls appear strictly in clearly labeled Featured Partner boxes.

When do Donald bathroom remodels trigger EPA Lead-Safe RRP rules?

Under 40 CFR 745.83, paid contractors working in pre-1978 Donald dwellings must hold EPA Lead-Safe RRP certification whenever interior work disturbs >6 sq ft of painted wall or trim.

Which permits should Donald homeowners demand in writing before deposits?

Cosmetic swaps rarely require permits, while moving shower drains, cutting joists for curbless pans, or wiring dedicated 120V GFCI walk-in tub circuits require municipal inspections in Donald.

What contract red flags should Donald buyers reject on bath or tub quotes?

Reject lump-sum 'today-only' bids omitting SKU sheets, false claims that Original Medicare pays for walk-in tubs ($0 under federal rules), or demands for >30% upfront deposits.

How do Donald homeowners confirm a license expiration date is still active?

Enter the license ID directly on Oregon CCB, Washington State L&I's live online lookup portal on contract signing day to confirm active standing with zero mid-year bond cancellations.

How is Donald, OR contractor data organized here?

This directory indexes 12 active Commercial General Contractor Level 2 firms in Donald across 2 ZIP codes directly from Oregon CCB, Washington State L&I public records without paid slot sales.

Sources

  1. Multi-State Contractor Licensing Open Feeds (29 States via State Boards) — State Contractor Licensing Boards (CA, TX, FL, WA, OR, IL, NY, CT, MD, NC, OH, PA, VA, etc.), 2026 Multi-State Registry Feed (retrieved 2026-11-25)
  2. 40 CFR Part 745 Subpart E — Lead-Based Paint Renovation, Repair, and Painting (RRP) — U.S. EPA / eCFR, 2026-01-01 (retrieved 2026-11-23)
  3. Occupational Employment and Wage Statistics (OEWS) State Estimates — SOC 47-1011, 47-2031, 47-2044, 47-2051, 47-2152 — U.S. Bureau of Labor Statistics, May 2025 OEWS State Release (retrieved 2026-11-23)

Comparable Bath & Kitchen Cost Directories