Skip to main content
Grant Estimator

Active Licensed Remodeling & Construction Contractors in Roy, WA

Verified Registry: Washington State L&I · 50 Active Firms
Official Registry Verification

In Roy, WA, Washington State L&I tracks 50 active licensed firms across 1 local ZIP code. Inspect 30 sampled registrations below alongside Washington's $38.96/hr (#8 of 51) base plumber wage. Published by US Home Data Lab for Active Licensed Remodeling & Construction Contractors, every remodeling cost table, fixture spec, wage rate, and federal grant limit comes from official government sources while separating voluntary 2010 ADA design guidance from mandatory IRC, IPC, and NEC building codes.

Total Active Firms
50
Listed Sample
30
ZIPs Covered
1
WA Plumber BLS
$38.96/hr
Installer hands checking level alignment of a stainless steel bathroom grab bar on ceramic tile
Licensed US residential tradespeople executing tiled bath rough-in and finish plumbing work.

Which BLS wage baselines govern Roy bathroom and slab estimates?

Comparing Roy itemized quotes to Washington's $38.96/hr (#8 of 51) plumber and $37.27/hr (#4 of 51) mason medians isolates shop overhead on active Washington State L&I contractor listings.

Which Roy, Washington firms carry active Washington State L&I registration?

Type any firm name, license ID, or ZIP code to narrow Roy listings from Washington State L&I; confirm zero mid-year suspensions directly on the official state lookup portal.

Active licensed contractors in Roy, Washington - Washington State L&I
6D Consulting LLC 6DCONCL827O1 GENERAL ACTIVE Active Feed Roy 98580
A & R Specialty Const LLC ARSPESC748MF GENERAL ACTIVE Active Feed Roy 98580
A+Professional Coatings Inc APROFCI994JD GENERAL ACTIVE Active Feed Roy 98580
Aaa #1 AAA1***067QC GENERAL ACTIVE Active Feed Roy 98580
Advanced Roof Design LLC ADVANRD894Q2 GENERAL ACTIVE Active Feed Roy 98580
Aei Construction Services LLC AEICOCS748CP GENERAL ACTIVE Active Feed Roy 98580
Aero Electric AEROE**055OA GENERAL ACTIVE Active Feed Roy 98580
Aldo's Const Finish Crpntr LLC ALDOSCF762L5 Cabinets, Millwork and Finish Carpentry ACTIVE Active Feed Roy 98580
Always Roofing LLC ALWAYRL751US GENERAL ACTIVE Active Feed Roy 98580
Anchor Homes LLC ANCHOHL948KP GENERAL ACTIVE Active Feed Roy 98580
Aptitude Mechanical LLC APTITML762KA GENERAL ACTIVE Active Feed Roy 98580
Artistic Grounds Service ARTISGS946CZ GENERAL ACTIVE Active Feed Roy 98580
Asz Roofing LLC ASZRORL741B7 GENERAL ACTIVE Active Feed Roy 98580
B Handy General Contractor LLC BHANDHG840P8 GENERAL ACTIVE Active Feed Roy 98580
Barrett's Gastech BARREG*746NL GENERAL ACTIVE Active Feed Roy 98580
Bcm Construction LLC BCMCOCL797KJ GENERAL ACTIVE Active Feed Roy 98580
Beyond Services LLC BEYONSL741LB GENERAL ACTIVE Active Feed Roy 98580
Bill Gonzales Construction LLC BILLGGC756LC GENERAL ACTIVE Active Feed Roy 98580
Bmr LLC BMRLLL*777LO GENERAL ACTIVE Active Feed Roy 98580
Countryside Homes LLC COUNTHL790QS GENERAL ACTIVE Active Feed Roy 98580
Cascade Craft Remodel & Repair CASCACR867B3 GENERAL ACTIVE Active Feed Roy 98580
Dale Larsen Excavating Inc DALELLE945J5 GENERAL ACTIVE Active Feed Roy 98580
Dh Jones Const & Rmdlng DHJONJC753DE GENERAL ACTIVE Active Feed Roy 98580
Diamond Masonry & Const LLC DIAMOMC884M3 GENERAL ACTIVE Active Feed Roy 98580
Dick Hook Construction DICKHC*148BN GENERAL ACTIVE Active Feed Roy 98580
Dl Welding DLWELW*845OW GENERAL ACTIVE Active Feed Roy 98580
Double J Enterprises LLC DOUBLJE753JZ GENERAL ACTIVE Active Feed Roy 98580
Dura-Built DURAB**887MJ GENERAL ACTIVE Active Feed Roy 98580
E&K General Contractor LLC EKGENGC834CW GENERAL ACTIVE Active Feed Roy 98580
Economy Septic Service Inc ECONOSS020P5 GENERAL ACTIVE Active Feed Roy 98580

Why verify specialty trade endorsements before hiring in Roy?

Verify bond coverage, active insurance, and trade-specific licenses directly through Washington State L&I before finalizing any Roy contract.

Limitations & Who Should Skip

  • Official licensing records confirm baseline active status with Washington State L&I, NOT individual craftsmanship, lien history, or open insurance claims.
  • General contractor licenses listed here do NOT automatically cover licensed Master Plumber drains, dedicated NEC 680.71 GFCI wiring, or EPA 40 CFR 745 Pre-1978 lead abatement unless separately endorsed.
  • Homeowners needing structural underpinning (>1/8 in slab shift) should NOT sign foundation pier bids without an independent $400-$800 PE report first.

Best-Fit Homeowner Profiles

  • Verify license live on signing day: Confirm the exact license number on Washington State L&I's live portal to catch mid-year bond cancellations.
  • Require itemized rough-in quotes: Split bath fixtures, 2-inch drain upgrades, GFCI subpanels, and permit fees cleanly instead of taking one lump-sum quote.

Which wet-zone code clearances protect bathroom occupants from injury?

Inspectors check IPC 412.3 ASSE 1016 anti-scald pressure balancing, dedicated NEC 210.8 / 680.71 GFCI protection, and EPA 40 CFR 745 lead containment above 6 sq ft in pre-1978 housing.

Bathroom Wet-Zone Code Safety: ASSE 1016, NEC 210.8 GFCI and EPA RRP Diagram summarizing three bathroom remodeling compliance zones: IPC 412.3 / ASSE 1016 anti-scald valve, NEC 210.8 / 680.71 dedicated GFCI circuit with service access, and EPA 40 CFR 745 6 sq ft lead-safe trigger in pre-1978 homes. 1. IPC 412.3 / ASSE 1016 Anti-Scald Mixing Valve Balances pressure & temp 1070 limiter on tub fillers 2. NEC 210.8 / 680.71 GFCI Dedicated 15A/20A Circuit Class A ground-fault trip Accessible pump panel 3. EPA 40 CFR 745 > 6 sq ft Pre-1978 Lead-Safe RRP Plastic containment zone EPA-certified firm required
Key residential plumbing, electrical, and lead-containment code checkpoints during bathroom remodeling.

What key rules and numbers govern Active Licensed Remodeling & Construction Contractors?

Questions below summarize primary US agency datasets, statutory limits, and IRC, IPC, or NEC compliance rules affecting Active Licensed Remodeling & Construction Contractors.

When do Roy bathroom remodels trigger EPA Lead-Safe RRP rules?

Under 40 CFR 745.83, paid contractors working in pre-1978 Roy dwellings must hold EPA Lead-Safe RRP certification whenever interior work disturbs >6 sq ft of painted wall or trim.

Which permits should Roy homeowners demand in writing before deposits?

Cosmetic swaps rarely require permits, while moving shower drains, cutting joists for curbless pans, or wiring dedicated 120V GFCI walk-in tub circuits require municipal inspections in Roy.

What contract red flags should Roy buyers reject on bath or tub quotes?

Reject lump-sum 'today-only' bids omitting SKU sheets, false claims that Original Medicare pays for walk-in tubs ($0 under federal rules), or demands for >30% upfront deposits.

How do Roy homeowners confirm a license expiration date is still active?

Enter the license ID directly on Washington State L&I's live online lookup portal on contract signing day to confirm active standing with zero mid-year bond cancellations.

Why are 30 firms listed for Roy, WA bathroom and remodel work?

Public state extracts from Washington State L&I document 30 active GENERAL registrations operating across 2 ZIP codes in Roy, WA.

Who should NOT rely solely on this Roy contractor directory without verification?

Owners planning structural foundation piers, pre-1978 lead abatement, or electrical upgrades must verify specific trade endorsements, active general liability insurance, surety bonds, and EPA RRP credentials directly on Washington State L&I.

How do Washington BLS plumber and mason wages shape Roy bids?

In Washington, direct BLS hourly medians sit at $38.96/hr (plumbers) and $37.27/hr (cement masons); licensed shops typically bill 1.9x to 2.4x direct pay to cover insurance and overhead.

Can a contractor in Roy pay to rank higher on this page?

No. GradeMark never sells ranking placement inside any Roy, WA state registry table; commercial partner calls appear strictly in clearly labeled Featured Partner boxes.

Sources

  1. Multi-State Contractor Licensing Open Feeds (29 States via State Boards) — State Contractor Licensing Boards (CA, TX, FL, WA, OR, IL, NY, CT, MD, NC, OH, PA, VA, etc.), 2026 Multi-State Registry Feed (retrieved 2026-11-25)
  2. 40 CFR Part 745 Subpart E — Lead-Based Paint Renovation, Repair, and Painting (RRP) — U.S. EPA / eCFR, 2026-01-01 (retrieved 2026-11-23)
  3. Occupational Employment and Wage Statistics (OEWS) State Estimates — SOC 47-1011, 47-2031, 47-2044, 47-2051, 47-2152 — U.S. Bureau of Labor Statistics, May 2025 OEWS State Release (retrieved 2026-11-23)

Comparable Bath & Kitchen Cost Directories